CriteriaPowder coatingsLiquid coatings
Surfaces / coating properties / film properties
  • High resistance to chemicals and mechanical stress in industrial applications
  • High elasticity and impact resistance
  • Powder coating systems for façade exteriors approved by Qualicoat and/or GSB/Qualitcoat
  • High chemical and mechanical resistance to chemicals in industrial applications
  • Impact resistance and elasticity are product-dependent
  • Weather-resistant systems in the gloss range (PVDF-based)
Substrate
  • Small irregularities in the substrate are very well covered by the high Film thickness of the coating
  • Very good bonding with the pre-treated substrate
  • Unevenness and scratches must be levelled or primed before coating
  • Good substrate wetting and adhesion strength
Economy / application efficiency
  • 60% to 80% first application efficiency
  • Overspray is recovered and fed back into the powder cycle
  • 30% to 40% first coat efficiency
  • Overspray cannot be recovered with solvent-based systems
Ecology
  • Solvent-free
  • Declaration-free
  • 100% Solids
  • Minimal fire risk
  • EPD certification (Environmental Product Declaration)
  • Contains solvents
  • VOC release
  • 35% Solids
  • Increased fire risk
Storage / Transport
  • No special safety regulations
  • Special transport and storage regulations
Layer thickness / Film thickness
  • Up to 120 µm Film thickness possible in one application
  • Single-layer applications with Qualicoat / GSB seal of approval in façade applications
  • Film thicknesses of 25 - 30 µm in one coat
  • 2-layer systems, depending on requirements
Curing process / cross-linking agent
  • Is thermally melted and cured (15 min. 160° C to 200° C)
  • Is chemically cured (2-component) hardened
Quality / resistance (corrosion DIN EN ISO 9227)
  • Very good results
  • Good to very good results
Processing times
  • Fast throughput times
  • After curing and cooling, the powder coating can be fully loaded immediately
  • Immediate further processing possible
  • Longer processing times
  • With air drying, further processing is possible after approx. 24 hours, significantly shorter with forced drying
Processing
  • Industrial processing (factory application) necessary
  • Location-independent, direct application on site possible
Application
  • With electrostatic (corona) and triboelectric systems (tribo), can be automated
  • Equipment is investment-intensive
  • With application equipment (airless spraying, compressed air spraying), can be automated
Order quantities
  • Stock items available from 2.5 kg
  • Minimum production quantities are sometimes required
  • Available from 1 to 2 kg
  • Mixing ramp / mixing systems available on site for Uni colours