| Criteria |
Powder coatings |
Liquid coatings |
| Surfaces / coating properties / film properties |
- High resistance to chemicals and mechanical stress in industrial applications
- High elasticity and impact resistance
- Powder coating systems for façade exteriors approved by Qualicoat and/or GSB/Qualitcoat
|
- High chemical and mechanical resistance to chemicals in industrial applications
- Impact resistance and elasticity are product-dependent
- Weather-resistant systems in the gloss range (PVDF-based)
|
| Substrate |
- Small irregularities in the substrate are very well covered by the high Film thickness of the coating
- Very good bonding with the pre-treated substrate
|
- Unevenness and scratches must be levelled or primed before coating
- Good substrate wetting and adhesion strength
|
| Economy / application efficiency |
- 60% to 80% first application efficiency
- Overspray is recovered and fed back into the powder cycle
|
- 30% to 40% first coat efficiency
- Overspray cannot be recovered with solvent-based systems
|
| Ecology |
- Solvent-free
- Declaration-free
- 100% Solids
- Minimal fire risk
- EPD certification (Environmental Product Declaration)
|
- Contains solvents
- VOC release
- 35% Solids
- Increased fire risk
|
| Storage / Transport |
- No special safety regulations
|
- Special transport and storage regulations
|
| Layer thickness / Film thickness |
- Up to 120 µm Film thickness possible in one application
- Single-layer applications with Qualicoat / GSB seal of approval in façade applications
|
- Film thicknesses of 25 - 30 µm in one coat
- 2-layer systems, depending on requirements
|
| Curing process / cross-linking agent |
- Is thermally melted and cured (15 min. 160° C to 200° C)
|
- Is chemically cured (2-component) hardened
|
| Quality / resistance (corrosion DIN EN ISO 9227) |
|
- Good to very good results
|
| Processing times |
- Fast throughput times
- After curing and cooling, the powder coating can be fully loaded immediately
- Immediate further processing possible
|
- Longer processing times
- With air drying, further processing is possible after approx. 24 hours, significantly shorter with forced drying
|
| Processing |
- Industrial processing (factory application) necessary
|
- Location-independent, direct application on site possible
|
| Application |
- With electrostatic (corona) and triboelectric systems (tribo), can be automated
- Equipment is investment-intensive
|
- With application equipment (airless spraying, compressed air spraying), can be automated
|
| Order quantities |
- Stock items available from 2.5 kg
- Minimum production quantities are sometimes required
|
- Available from 1 to 2 kg
- Mixing ramp / mixing systems available on site for Uni colours
|